Commit Graph

9 Commits

Author SHA1 Message Date
hsiegeln
e84e53f835 Add SaaS platform UX polish implementation plan (8 tasks)
Detailed step-by-step plan covering layout fixes (label/value collision,
DS variable adoption), header/navigation (sidebar active state,
breadcrumbs, collapse), error handling, DS component adoption, sign-in
improvements, and polish (tier colors, badges, confirmations).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-09 19:46:44 +02:00
hsiegeln
538591989c docs: mark Plan 3 (runtime management port) as completed
All checks were successful
CI / build (push) Successful in 1m25s
CI / docker (push) Successful in 11s
Verified 2026-04-09: all runtime management fully ported to
cameleer3-server with enhancements beyond the original plan.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-09 08:58:15 +02:00
hsiegeln
3fa062b92c docs: add architecture review spec and implementation plans
Some checks failed
CI / build (push) Failing after 25s
CI / docker (push) Has been skipped
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 08:53:22 +02:00
hsiegeln
1397267be5 docs: add auth overhaul implementation plan
16 tasks across 3 phases: server OIDC support, SaaS auth rewrite,
infrastructure updates. TDD, complete code, greenfield migrations.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-05 12:26:47 +02:00
hsiegeln
fb4e1f57e5 docs: add Phase 9 Frontend React Shell implementation plan
All checks were successful
CI / build (push) Successful in 40s
CI / docker (push) Successful in 5s
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-04 23:10:25 +02:00
hsiegeln
f8d80eaf79 docs: add Phase 4 Observability Pipeline implementation plan
All checks were successful
CI / build (push) Successful in 28s
CI / docker (push) Successful in 4s
8 tasks: migration, labels support, routing API, agent/observability
status endpoints, Traefik routing labels, connectivity check,
Docker Compose + env, HOWTO update.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-04 20:52:17 +02:00
hsiegeln
fa7853b02d docs: add Phase 3 Runtime Orchestration implementation plan
16-task plan covering environments, apps, deployments, Docker
runtime orchestrator, ClickHouse log ingestion, and CI updates.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-04 17:24:20 +02:00
hsiegeln
24309eab94 docs: add dual deployment architecture spec and Phase 2 plan
Architecture spec covers Docker+K8s dual deployment with build-vs-buy
decisions (Logto, Traefik, Stripe, deferred Lago/Vault). Phase 2 plan
has 12 implementation tasks for tenants, identity, and licensing.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-04 14:45:33 +02:00
hsiegeln
5e06d31cfb Add phase roadmap and Phase 1 implementation plan
Phase roadmap: 9 phases from foundation to frontend, each producing
working, testable software independently.

Phase 1 plan: Foundation + Auth — 10 tasks, ~60 steps covering:
- Maven project setup (Spring Boot 3.4.3, Java 21)
- PostgreSQL + Docker Compose + TestContainers
- Flyway migrations (users, roles, permissions, audit_log)
- Immutable audit logging framework
- User registration with bcrypt
- Ed25519 JWT signing (no third-party JWT library)
- Login with audit trail
- Spring Security JWT filter + RBAC
- Dockerfile + Gitea Actions CI

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-29 23:58:25 +02:00