Records what landed (19 commits, 273/273 tests green), what's required
before the branch merges (push loader image, regen OpenAPI when backend
is reachable), and the deferred items (Task 12 IT, the polish backlog).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>