Commit Graph

3 Commits

Author SHA1 Message Date
hsiegeln
cb3ebfea7c chore: rename cameleer3 to cameleer
Some checks failed
CI / cleanup-branch (push) Has been skipped
CI / build (push) Failing after 18s
CI / docker (push) Has been skipped
CI / deploy (push) Has been skipped
CI / deploy-feature (push) Has been skipped
Rename Java packages from com.cameleer3 to com.cameleer, module
directories from cameleer3-* to cameleer-*, and all references
throughout workflows, Dockerfiles, docs, migrations, and pom.xml.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-15 15:28:42 +02:00
hsiegeln
da09e5fda7 fix(01): revise plans based on checker feedback
- Remove AbstractClickHouseIT and application-test.yml from Plan 01-01,
  move to Plan 01-03 Task 1 (reduces 01-01 from 15 to 13 files)
- Change Plan 01-02 Task 1 tdd="true" to tdd="false" (compile-only verify)
- Add DiagramRepository and MetricsRepository flush key_links to Plan 01-02
- Update VALIDATION.md: INGST-06 TTL maps to HealthControllerIT#ttlConfigured*
  instead of non-existent ClickHouseTtlIT

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:40:20 +01:00
hsiegeln
9ba1b839df docs(01): add phase 1 research and validation strategy
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:29:01 +01:00