Commit Graph

12 Commits

Author SHA1 Message Date
hsiegeln
ff0af0ef2f docs(01-03): complete API foundation plan
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 12:05:02 +01:00
hsiegeln
b2501f2937 docs(01-01): complete ClickHouse infrastructure and WriteBuffer plan
- Create 01-01-SUMMARY.md with execution results
- Update STATE.md with plan progress and decisions
- Update REQUIREMENTS.md marking INGST-04, INGST-05, INGST-06 complete
- Update ROADMAP.md with phase 01 progress

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:51:14 +01:00
hsiegeln
5436c0a490 fix(01): revise plan 01-02 wave 2 to wave 3, add 01-03 dependency
Integration tests in 01-02 extend AbstractClickHouseIT from 01-03.
Both were wave 2 (parallel), causing potential compilation failure.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:43:57 +01:00
hsiegeln
da09e5fda7 fix(01): revise plans based on checker feedback
- Remove AbstractClickHouseIT and application-test.yml from Plan 01-01,
  move to Plan 01-03 Task 1 (reduces 01-01 from 15 to 13 files)
- Change Plan 01-02 Task 1 tdd="true" to tdd="false" (compile-only verify)
- Add DiagramRepository and MetricsRepository flush key_links to Plan 01-02
- Update VALIDATION.md: INGST-06 TTL maps to HealthControllerIT#ttlConfigured*
  instead of non-existent ClickHouseTtlIT

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:40:20 +01:00
hsiegeln
e808b567cd docs(01): create phase plan (3 plans, 2 waves)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:33:32 +01:00
hsiegeln
9ba1b839df docs(01): add phase 1 research and validation strategy
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:29:01 +01:00
hsiegeln
ef934743fb docs(phase-1): research ingestion pipeline and API foundation domain
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:27:59 +01:00
hsiegeln
7294f4be68 docs: create roadmap (4 phases, 32 requirements mapped)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:19:53 +01:00
hsiegeln
e11496242f docs: define v1 requirements (32 requirements, 6 categories)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:15:04 +01:00
hsiegeln
6f39e29707 docs: add domain research (stack, features, architecture, pitfalls)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 11:05:37 +01:00
hsiegeln
06a0fddc73 chore: add project config
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 10:57:28 +01:00
hsiegeln
e1a5d994a6 docs: initialize project
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 10:54:37 +01:00