--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: in-progress stopped_at: Completed 02-03-PLAN.md (Phase 02 complete) last_updated: "2026-03-11T15:32:00Z" last_activity: 2026-03-11 -- Completed 02-03 (Search endpoints, detail controller, 24 tests) progress: total_phases: 4 completed_phases: 2 total_plans: 3 completed_plans: 3 percent: 75 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-11) **Core value:** Users can reliably search and find any transaction across all connected Camel instances -- by any combination of state, time, duration, or content -- even at millions of transactions per day with 30-day retention. **Current focus:** Phase 2: Transaction Search + Diagrams ## Current Position Phase: 2 of 4 (Transaction Search + Diagrams) -- COMPLETE Plan: 3 of 3 in current phase Status: Phase 02 Complete Last activity: 2026-03-11 -- Completed 02-03 (Search endpoints, detail controller, tree reconstruction, 24 tests) Progress: [████████--] 75% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: - - Total execution time: 0 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | - | - | - | - | **Recent Trend:** - Last 5 plans: - - Trend: - *Updated after each plan completion* | Phase 01 P01 | 3min | 2 tasks | 13 files | | Phase 01 P02 | 7min | 2 tasks | 14 files | | Phase 01 P03 | 10min | 2 tasks | 12 files | | Phase 02 P01 | 13min | 2 tasks | 15 files | | Phase 02 P02 | 14min | 2 tasks | 10 files | | Phase 02 P03 | 12min | 2 tasks | 9 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - [Roadmap]: ClickHouse chosen as primary store (research recommendation, HIGH confidence) - [Roadmap]: Full-text search starts with ClickHouse skip indexes (tokenbf_v1), OpenSearch deferred - [Roadmap]: Phases 2 and 3 can execute in parallel (both depend only on Phase 1) - [Roadmap]: Web UI deferred to v2 - [Phase 01]: Used spring-boot-starter-jdbc for JdbcTemplate + HikariCP auto-config - [Phase 01]: Created MetricsSnapshot record in core module (cameleer3-common has no metrics model) - [Phase 01]: Upgraded testcontainers to 2.0.3 for Docker Desktop 29.x compatibility - [Phase 01]: Changed error_message/error_stacktrace to non-nullable String for tokenbf_v1 index compat - [Phase 01]: TTL expressions require toDateTime() cast for DateTime64 columns in ClickHouse 25.3 - [Phase 01]: Controllers accept raw String body to support both single and array JSON payloads - [Phase 01]: IngestionService is a plain class in core module, wired as bean by IngestionBeanConfig in app - [Phase 01]: Removed @Configuration from IngestionConfig to fix duplicate bean with @EnableConfigurationProperties - [Phase 02]: FlatProcessor record captures depth and parentIndex during DFS traversal - [Phase 02]: Exchange bodies/headers concatenated into single String columns for LIKE search - [Phase 02]: Headers serialized to JSON via Jackson ObjectMapper (static instance) - [Phase 02]: DiagramRenderer/DiagramLayout stubs created to resolve pre-existing compilation blocker - [Phase 02]: ELK layered algorithm with top-to-bottom direction for route diagram layout - [Phase 02]: JFreeSVG over Batik for lightweight server-side SVG generation - [Phase 02]: Manual Accept header parsing -- JSON only when first preference, SVG as default - [Phase 02]: xtext xbase lib required at runtime by ELK 0.11.0 LayeredMetaDataProvider - [Phase 02]: Compound node children detected from RouteNode.getChildren() (matches agent graph model) - [Phase 02]: Search tests use correlationId scoping for shared ClickHouse isolation - [Phase 02]: findProcessorSnapshot uses ClickHouse 1-indexed array access - [Phase 02]: DetailController injects ClickHouseExecutionRepository directly for snapshot (not via interface) ### Pending Todos None yet. ### Blockers/Concerns - [Phase 1]: ClickHouse Java client API needs phase-specific research (library has undergone changes) - [Phase 1]: Must read cameleer3-common PROTOCOL.md before designing ClickHouse schema - [Phase 2]: Diagram rendering library selection is an open question (Batik, jsvg, JGraphX, or client-side) - [Phase 2]: ClickHouse skip indexes may not suffice for full-text; decision point during Phase 2 ## Session Continuity Last session: 2026-03-11T15:32:00Z Stopped at: Completed 02-03-PLAN.md (Phase 02 complete) Resume file: .planning/phases/02-transaction-search-diagrams/02-03-SUMMARY.md