Files
cameleer-server/docs/superpowers/plans
hsiegeln e558494f8d plan(deploy): checkpoints table redesign + audit gap
15 tasks across 5 phases (backend foundation → SideDrawer →
ConfigTabs readOnly → CheckpointsTable + DetailDrawer → polish).
TDD throughout with per-task commits. Backend phase ships
independently to close the audit gap as quickly as possible.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-23 11:39:11 +02:00
..