Files
cameleer-server/.planning/STATE.md
hsiegeln ea44a88f7d docs(03-02): complete SSE push plan
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 19:18:15 +01:00

5.5 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone in-progress Completed 03-02-PLAN.md 2026-03-11T18:16:10Z 2026-03-11 -- Completed 03-02 (SSE push + command delivery)
total_phases completed_phases total_plans completed_plans percent
4 2 9 9 95

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-11)

Core value: Users can reliably search and find any transaction across all connected Camel instances -- by any combination of state, time, duration, or content -- even at millions of transactions per day with 30-day retention. Current focus: Phase 3: Agent Registry + SSE Push

Current Position

Phase: 3 of 4 (Agent Registry + SSE Push) Plan: 2 of 2 in current phase (SSE push + command delivery) Status: Phase 03 complete, Phase 04 remaining Last activity: 2026-03-11 -- Completed 03-02 (SSE push + command delivery)

Progress: [█████████░] 95%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion | Phase 01 P01 | 3min | 2 tasks | 13 files | | Phase 01 P02 | 7min | 2 tasks | 14 files | | Phase 01 P03 | 10min | 2 tasks | 12 files | | Phase 02 P01 | 13min | 2 tasks | 15 files | | Phase 02 P02 | 14min | 2 tasks | 10 files | | Phase 02 P03 | 12min | 2 tasks | 9 files | | Phase 02 P04 | 22min | 1 tasks | 5 files | | Phase 03 P01 | 15min | 2 tasks | 15 files | | Phase 03 P02 | 32min | 2 tasks | 7 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Roadmap]: ClickHouse chosen as primary store (research recommendation, HIGH confidence)
  • [Roadmap]: Full-text search starts with ClickHouse skip indexes (tokenbf_v1), OpenSearch deferred
  • [Roadmap]: Phases 2 and 3 can execute in parallel (both depend only on Phase 1)
  • [Roadmap]: Web UI deferred to v2
  • [Phase 01]: Used spring-boot-starter-jdbc for JdbcTemplate + HikariCP auto-config
  • [Phase 01]: Created MetricsSnapshot record in core module (cameleer3-common has no metrics model)
  • [Phase 01]: Upgraded testcontainers to 2.0.3 for Docker Desktop 29.x compatibility
  • [Phase 01]: Changed error_message/error_stacktrace to non-nullable String for tokenbf_v1 index compat
  • [Phase 01]: TTL expressions require toDateTime() cast for DateTime64 columns in ClickHouse 25.3
  • [Phase 01]: Controllers accept raw String body to support both single and array JSON payloads
  • [Phase 01]: IngestionService is a plain class in core module, wired as bean by IngestionBeanConfig in app
  • [Phase 01]: Removed @Configuration from IngestionConfig to fix duplicate bean with @EnableConfigurationProperties
  • [Phase 02]: FlatProcessor record captures depth and parentIndex during DFS traversal
  • [Phase 02]: Exchange bodies/headers concatenated into single String columns for LIKE search
  • [Phase 02]: Headers serialized to JSON via Jackson ObjectMapper (static instance)
  • [Phase 02]: DiagramRenderer/DiagramLayout stubs created to resolve pre-existing compilation blocker
  • [Phase 02]: ELK layered algorithm with top-to-bottom direction for route diagram layout
  • [Phase 02]: JFreeSVG over Batik for lightweight server-side SVG generation
  • [Phase 02]: Manual Accept header parsing -- JSON only when first preference, SVG as default
  • [Phase 02]: xtext xbase lib required at runtime by ELK 0.11.0 LayeredMetaDataProvider
  • [Phase 02]: Compound node children detected from RouteNode.getChildren() (matches agent graph model)
  • [Phase 02]: Search tests use correlationId scoping for shared ClickHouse isolation
  • [Phase 02]: findProcessorSnapshot uses ClickHouse 1-indexed array access
  • [Phase 02]: DetailController injects ClickHouseExecutionRepository directly for snapshot (not via interface)
  • [Phase 02]: DiagramRepository injected via constructor into ClickHouseExecutionRepository for diagram hash lookup during batch insert
  • [Phase 02]: Awaitility ignoreExceptions pattern adopted for all ClickHouse polling assertions
  • [Phase 02]: Surefire and Failsafe both need reuseForks=false for ELK classloader isolation
  • [Phase 03]: AgentInfo as Java record with wither-style methods for immutable ConcurrentHashMap swapping
  • [Phase 03]: Dead threshold measured from staleTransitionTime, not lastHeartbeat
  • [Phase 03]: spring.mvc.async.request-timeout=-1 set proactively for SSE support in Plan 02
  • [Phase 03]: SSE events path excluded from ProtocolVersionInterceptor for EventSource client compatibility
  • [Phase 03]: SseConnectionManager uses reference-equality in emitter callbacks to avoid removing newer emitters
  • [Phase 03]: java.net.http.HttpClient async API for SSE integration tests (no webflux dependency)

Pending Todos

None yet.

Blockers/Concerns

  • [Phase 1]: ClickHouse Java client API needs phase-specific research (library has undergone changes)
  • [Phase 1]: Must read cameleer3-common PROTOCOL.md before designing ClickHouse schema
  • [Phase 2]: Diagram rendering library selection is an open question (Batik, jsvg, JGraphX, or client-side)
  • [Phase 2]: ClickHouse skip indexes may not suffice for full-text; decision point during Phase 2

Session Continuity

Last session: 2026-03-11T18:16:10Z Stopped at: Completed 03-02-PLAN.md Resume file: .planning/phases/04-security-auth/04-01-PLAN.md