Commit Graph

9 Commits

Author SHA1 Message Date
hsiegeln
96e5f77a14 docs: add sidebar section layout implementation plan
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-15 20:53:53 +02:00
hsiegeln
e07afe37f2 docs: add Recharts migration implementation plan
All checks were successful
Build & Publish / publish (push) Successful in 1m2s
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-12 19:30:33 +02:00
hsiegeln
3561147b42 docs: add composable sidebar implementation plan
10-task plan covering compound component, CSS, exports, tests,
LayoutShell, route migration, and page wrapper stripping.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-02 17:50:56 +02:00
hsiegeln
e664e449c3 docs: add 4 implementation plans for mock deviation cleanup
Plan 1: KpiStrip + StatusText + Card title (metrics)
Plan 2: SplitPane + EntityList (admin)
Plan 3: LogViewer + AgentHealth DataTable refactor (observability)
Plan 4: COMPONENT_GUIDE.md + Inventory updates (documentation)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-24 12:10:00 +01:00
hsiegeln
5c02b52cb0 docs: add login dialog implementation plan
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-24 11:00:44 +01:00
hsiegeln
544b82301a docs: add admin redesign implementation plan
11-task plan covering token fix, Tabs migration, DataTable migration,
title cleanup, user creation rework with provider selection, password
management, toast feedback, accessibility, and cascading confirmations.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-18 23:36:48 +01:00
hsiegeln
fc835ef3f9 docs: add admin pages implementation plan
16-task plan covering InlineEdit, ConfirmDialog, MultiSelect components,
admin layout/routing, AuditLog, OidcConfig, UserManagement pages,
inventory demos, and integration verification.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-18 22:59:10 +01:00
hsiegeln
2c427a31a1 docs: add implementation plan for design system packaging
8-task plan covering: git remote, vite-plugin-dts, library entry point,
Vite lib config, package.json, Gitea Actions CI/CD, consumer docs, push.

Fixes from review: deterministic output filename, .npmrc echo instead of
heredoc, dist/ in .gitignore, prerequisite for untracked files, dts
verification, worktree guidance.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-18 20:19:16 +01:00
hsiegeln
e5c3679b9e plan: Cameleer3 design system implementation plan (30 tasks)
Covers: scaffold, foundations, 23 primitives, 15 composites,
3 layout components, mock data, and 5 pages.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-18 08:56:13 +01:00