hsiegeln
544b82301a
docs: add admin redesign implementation plan
...
11-task plan covering token fix, Tabs migration, DataTable migration,
title cleanup, user creation rework with provider selection, password
management, toast feedback, accessibility, and cascading confirmations.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-03-18 23:36:48 +01:00
hsiegeln
fc835ef3f9
docs: add admin pages implementation plan
...
16-task plan covering InlineEdit, ConfirmDialog, MultiSelect components,
admin layout/routing, AuditLog, OidcConfig, UserManagement pages,
inventory demos, and integration verification.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-03-18 22:59:10 +01:00
hsiegeln
2c427a31a1
docs: add implementation plan for design system packaging
...
8-task plan covering: git remote, vite-plugin-dts, library entry point,
Vite lib config, package.json, Gitea Actions CI/CD, consumer docs, push.
Fixes from review: deterministic output filename, .npmrc echo instead of
heredoc, dist/ in .gitignore, prerequisite for untracked files, dts
verification, worktree guidance.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-03-18 20:19:16 +01:00
hsiegeln
e5c3679b9e
plan: Cameleer3 design system implementation plan (30 tasks)
...
Covers: scaffold, foundations, 23 primitives, 15 composites,
3 layout components, mock data, and 5 pages.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-03-18 08:56:13 +01:00