gsd_state_version: 1.0
|
|
milestone: v1.0
|
|
milestone_name: milestone
|
|
status: in-progress
|
|
stopped_at: Completed 02-03-PLAN.md (Phase 02 complete)
|
|
last_updated: "2026-03-11T15:32:00Z"
|
|
last_activity: 2026-03-11 -- Completed 02-03 (Search endpoints, detail controller, 24 tests)
|
|
progress:
|
|
total_phases: 4
|
|
completed_phases: 2
|
|
total_plans: 3
|
|
completed_plans: 3
|
|
percent: 75
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-03-11)
|
|
|
|
**Core value:** Users can reliably search and find any transaction across all connected Camel instances -- by any combination of state, time, duration, or content -- even at millions of transactions per day with 30-day retention.
|
|
**Current focus:** Phase 2: Transaction Search + Diagrams
|
|
|
|
## Current Position
|
|
|
|
Phase: 2 of 4 (Transaction Search + Diagrams) -- COMPLETE
|
|
Plan: 3 of 3 in current phase
|
|
Status: Phase 02 Complete
|
|
Last activity: 2026-03-11 -- Completed 02-03 (Search endpoints, detail controller, tree reconstruction, 24 tests)
|
|
|
|
Progress: [████████--] 75%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
- Total plans completed: 0
|
|
- Average duration: -
|
|
- Total execution time: 0 hours
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| - | - | - | - |
|
|
|
|
**Recent Trend:**
|
|
- Last 5 plans: -
|
|
- Trend: -
|
|
|
|
*Updated after each plan completion*
|
|
| Phase 01 P01 | 3min | 2 tasks | 13 files |
|
|
| Phase 01 P02 | 7min | 2 tasks | 14 files |
|
|
| Phase 01 P03 | 10min | 2 tasks | 12 files |
|
|
| Phase 02 P01 | 13min | 2 tasks | 15 files |
|
|
| Phase 02 P02 | 14min | 2 tasks | 10 files |
|
|
| Phase 02 P03 | 12min | 2 tasks | 9 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- [Roadmap]: ClickHouse chosen as primary store (research recommendation, HIGH confidence)
|
|
- [Roadmap]: Full-text search starts with ClickHouse skip indexes (tokenbf_v1), OpenSearch deferred
|
|
- [Roadmap]: Phases 2 and 3 can execute in parallel (both depend only on Phase 1)
|
|
- [Roadmap]: Web UI deferred to v2
|
|
- [Phase 01]: Used spring-boot-starter-jdbc for JdbcTemplate + HikariCP auto-config
|
|
- [Phase 01]: Created MetricsSnapshot record in core module (cameleer3-common has no metrics model)
|
|
- [Phase 01]: Upgraded testcontainers to 2.0.3 for Docker Desktop 29.x compatibility
|
|
- [Phase 01]: Changed error_message/error_stacktrace to non-nullable String for tokenbf_v1 index compat
|
|
- [Phase 01]: TTL expressions require toDateTime() cast for DateTime64 columns in ClickHouse 25.3
|
|
- [Phase 01]: Controllers accept raw String body to support both single and array JSON payloads
|
|
- [Phase 01]: IngestionService is a plain class in core module, wired as bean by IngestionBeanConfig in app
|
|
- [Phase 01]: Removed @Configuration from IngestionConfig to fix duplicate bean with @EnableConfigurationProperties
|
|
- [Phase 02]: FlatProcessor record captures depth and parentIndex during DFS traversal
|
|
- [Phase 02]: Exchange bodies/headers concatenated into single String columns for LIKE search
|
|
- [Phase 02]: Headers serialized to JSON via Jackson ObjectMapper (static instance)
|
|
- [Phase 02]: DiagramRenderer/DiagramLayout stubs created to resolve pre-existing compilation blocker
|
|
- [Phase 02]: ELK layered algorithm with top-to-bottom direction for route diagram layout
|
|
- [Phase 02]: JFreeSVG over Batik for lightweight server-side SVG generation
|
|
- [Phase 02]: Manual Accept header parsing -- JSON only when first preference, SVG as default
|
|
- [Phase 02]: xtext xbase lib required at runtime by ELK 0.11.0 LayeredMetaDataProvider
|
|
- [Phase 02]: Compound node children detected from RouteNode.getChildren() (matches agent graph model)
|
|
- [Phase 02]: Search tests use correlationId scoping for shared ClickHouse isolation
|
|
- [Phase 02]: findProcessorSnapshot uses ClickHouse 1-indexed array access
|
|
- [Phase 02]: DetailController injects ClickHouseExecutionRepository directly for snapshot (not via interface)
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- [Phase 1]: ClickHouse Java client API needs phase-specific research (library has undergone changes)
|
|
- [Phase 1]: Must read cameleer3-common PROTOCOL.md before designing ClickHouse schema
|
|
- [Phase 2]: Diagram rendering library selection is an open question (Batik, jsvg, JGraphX, or client-side)
|
|
- [Phase 2]: ClickHouse skip indexes may not suffice for full-text; decision point during Phase 2
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-03-11T15:32:00Z
|
|
Stopped at: Completed 02-03-PLAN.md (Phase 02 complete)
|
|
Resume file: .planning/phases/02-transaction-search-diagrams/02-03-SUMMARY.md
|